Pressure Differential Switch Calibration
Test Equipment Required:
a. Check and confirm instrument range as per specification.
b. Hook-up instrument as per typical test set-up.
For Switch Low
1) Apply the calibrating pressure above the reset value of the set pressure.
2) Slowly decrease the calibrating pressure and confirm switch contacts transfer from N.C. to N.O. (or vice versa).
3) Record the pressure where the switch contact transfer happened.
4) Increase the calibrating pressure until the switch resets (Multimeter continuity will change) and record the reset point.
For Switch High
1) Gradually increase the calibrating pressure to the set pressure and confirm switch contact transfers from NC to NO (or vice versa).
2) Record the pressure where the switch contact transfer.
3) Decrease the calibrating pressure until the switch resets (Multimeter continuity will change) and record the set point
Record all result in instrument Calibration (Switches) Test Check sheets or Calibration Check Sheet.
PLC ladder logic design to control 3 motors with toggle switch and explain the program…
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
View Comments
Good