🔥 FREE FIELDBUS COURSE → REGISTER NOW 🚀 Online Training

Too often done riskily repaired Roof Hot Spots eliminated forever

Root Cause Analysis (RCA) related to the roof hot spots repairs and their problem eliminated forever.

Primary Reformer – Each Turnaround done expensive Tubes Repairs

Primary Reformer – Each Turnaround done massive and expensive Tubes Repairs eliminated.

PTFE lined 6” 300# butt weld end Plug Valves Leaks Stopped Forever

Root Cause Analysis (RCA): Urea Plant tight shut off impossible PTFE liner 6” 300# butt weld end Plug Valves leaks stopped.

Rupture Discs bursts caused too many Urea Plant Shutdowns

Root Cause Analysis (RCA): Repeat Rupture Discs (RD) bursts shutdowns a Urea Plant each time.

Repeat Safety Valve Popping caused Urea Plant Shutdown

A urea plant lost 10 days within a month from Repeat Safety Valve Popping stopped & recurrence eliminated.

RCA Related to Trip Throttle Valve (TTV)

Root Cause Analysis (RCA) related to the Steam Turbine Stubborn Dissemble defying 12” 2500 # Trip Throttle Valve.

Seawater Pipeline Spools from day-1 leaks threaten Plant Shutdown

Root Cause Analysis (RCA): Seawater pipeline spools from day-1 leaks threaten NH3 plant indefinite shutdown.

Steam Letdown Station Problems and their Solutions

Root Cause Analysis (RCA): Steam turbine 100 to 40 bar steam letdown station 3-year long persistent flange leaks stopped.

Flange Joint Errors shutdowns root cause analyzed and eliminated

Flange Joint Errors shutdowns a plant and its root cause analyzed and eliminated.

Leaking Plug Valves Pose Safety Hazards and Lead to Plant Shutdown

Sledge open/close too hard to operate and leaking plug valves pose safety hazards and lead to plant shutdown.