A PLC has been programming to control the starting and stopping of a three-phase electric motor.
Shown here are a partial wiring diagram and offline PLC program display for the system:
Identify the problem(s) in this PLC program, and modify it so that it will work as it should.
The OL_switch instruction in the PLC program needs to be changed to NO (Normally-Open).
Since the real-world OL switch contact is supposed to be in the closed state when everything is okay, and this means the third input channel should be energized when all is well, a NO contact instruction is required so that the “1” bit state will maintain that instruction in the “colored” state and permit the coil instruction to receive color (virtual power) to run the motor.
More PLC Questions :
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…
View Comments
Vibration sensor transmitter output 4 to 20 measure weight kilograms and how is degree fx Plc programming guidelines please