Electrical Basics

Difference between Current Transformer and Potential Transformer

Current Transformers (CT) and Potential Transformers (PT) are used to measure the current and voltage in a circuit of the order of hundreds of amperes and volts respectively.

A CT has large number of turns on its secondary winding, but very few turns on its primary winding. The primary winding is connected in series with the load so that it carries full load current. A low voltage range ammeter (0-5A) is connected across the secondary winding terminals. Secondary of the CT is practically short circuited since the ammeter resistance is very low. It should be remembered that secondary of the CT should not be made open as it draws heavy current and damages the primary winding of the CT

A PT has large number of turns in the primary and fewer turns in the secondary and hence it steps down the voltage. The primary winding is connected across the supply voltage and low range voltmeter (0-110V) is connected across the secondary winding terminals

Some of the main difference between current transformers (CT) and potential transformers (PT) are given below:

  • The secondary of the CT is almost short circuit, whereas the secondary of the PT is practically a open circuit
  • The primary winding of the CT is connected in series with the load so that it carries the full line current, but there is only a small voltage across it. However the primary winding of the PT has the full supply voltage applied across it
  • In CT the excitation current I0 and flux density vary over a wide range whereas in PT, they vary over a limited range only
You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

VFD Simulator Download – Free Yaskawa V1000 Software

VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…

2 days ago
  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

5 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

5 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

6 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

3 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

5 days ago