PLC Switch Actuation Status
Determine the necessary PLC switch actuation status (i.e. low versus high process stimulus) to turn the yellow lamp on.
Determine the necessary PLC switch actuation status (i.e. low versus high process stimulus) to turn the yellow lamp on.
Sketch a Ladder Diagram program for this PLC to energize the lamp if the following input conditions are met.
Suppose we have a PLC connected to three pushbutton switches. Sketch a Ladder Diagram program for program example.
Suppose we have an Allen-Bradley MicroLogix 1000 PLC and two pressure switches we need to connect to it.
Question & Answer – A PLC has been programming to control the starting and stopping of a three-phase electric motor.
A PLC has been programming to control the starting and stopping of a three-phase electric motor.
Identify the problem(s) in this PLC program, and modify it so that it will work as it should.
We have a problem in one of the PLC Permissive Inputs that there is a programming mistake, do the troubleshooting.
PLC program to control a water pump driven by an electric motor. It will be manually started and stopped by pushbutton switches, and shut down automatically by any one of several “permissive” switches.
Instrumentation Tools assists you with a complete guide of objective questions which mainly targets the aspirants of Electrical, Electronics and