Inst ToolsInst ToolsInst Tools
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Interview Questions on Battery Testing
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Electrical Q & A > Interview Questions on Battery Testing

Interview Questions on Battery Testing

Last updated: September 11, 2016 7:12 am
Editorial Staff
Electrical Q & A
No Comments
Share
6 Min Read
SHARE

Measuring the float voltage of cells is usually easy, but how useful are the results produced by this measurement?

In reality, float voltage measurements are of limited value. They can be used to confirm that the charger is working, but they give no information at all about the batteries state of health. Measuring the float voltage of a cell will also show whether or not it is fully charged, but it is important to remember that, just because a cell is fully charged, this doesn’t mean that it will deliver full capacity. It is by no means unusual for a battery that is close to failure to have a float voltage that is within acceptable limits.

A low float voltage may indicate that there is a short in the cell. In a lead-acid battery, this should be suspected if the float voltage is 2.06 V or less, assuming that the charger is set for 2.17 V per cell. In other cases, a cell may float at a considerably higher voltage than average. This may be because the high float voltage cell is compensating for another weaker cell that is floating low. It is also possible for one cell to float high to compensate for several cells that are floating a little low, because the total of all the cell float voltages must always equal the charger setting.

How important is inter-cell connection resistance?

Experience shows that loose inter-cell connections that heat up and melt open are responsible for more battery failures than defective cells. This is a particular problem with lead-acid batteries that are frequently cycled, as the negative terminal may cold flow, thereby loosening the connection. Checking inter-cell connection resistance is, therefore, vitally important. It is, however, essential to follow the correct sequence of test when working on multi-post batteries, and also to ensure that the instrument employs a method of testing that will provide valid results in this application.

How often should battery impedance testing be carried out?

The best frequency for impedance testing depends on the battery type, the site conditions and previous maintenance practices. The IEEE 11888 standard for VRLA batteries recommends, for example, that a baseline impedance measurement is made six months after the battery has been put into service, and that further impedance measurements are made at quarterly intervals there-after. For NiCd and flooded lead-acid batteries, Megger recommends impedance testing at six monthly intervals. Impedance measurements should also be made immediately before carrying out every capacity test.

How to predict when I need to change a cell?

Even though the correlation between battery capacity and impedance is not mathematically perfect, increase in impedance is an excellent indicator of battery health. Megger has found that, for flooded lead-acid batteries, a 20% increase in impedance generally indicates that the battery capacity has declined to about 80% of its initial value. For VRLA batteries, the corresponding impedance increase is closer to 50%. When these figures are reached, it is usual to consider that cell replacement is necessary.

When should I stop changing cells and simply replace the whole battery?

In short strings (less than 40 cells), it’s advisable to replace the entire battery when between three and five cells have been changed. For longer strings, replacement is advised when more than 10% of the cells have been changed.

Will capacity testing damage my battery?

Battery systems are designed to provide back-up supplies during power outages. Since a discharge test is nothing other than a simulated power outage, there is no risk of battery damage. Batteries can normally be deep discharged (that is, discharged to the manufacturer’s end-of-discharge voltage) between 100 and 1,000 times, depending on the type of battery. Using a few of these discharge cycles for capacity testing has a negligible effect on overall battery life. Nevertheless, there is no reason to carry out discharge testing more frequently than recommended by the relevant standards.

Is it possible to carry out a discharge test on a battery while it is still on line?

Yes, provided that the right test equipment is used. Megger, for example, has testers that automatically sense and regulate the discharge current even when the batteries are connected to their normal load. Most users choose to make an 80% discharge test if the battery is to remain on line, thereby ensuring that there is still some back-up capability remaining at the end of the test.

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
DC machines and Induction Machines Viva Questions & Answers
Transformers Questions & Answers Part-1
Electrical Motors Interview Question And Answers
Electrical Machines Objective Questions & Answers
Power System Interview Question and Answers
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Electrical Drives and Controls Interview Questions

Electrical Drives and Controls Interview Questions

Transmission and Distribution Interview Questions

Transmission and Distribution Interview Questions

Interview Questions and Answers

Electrical Machines Interview Questions and Answers

Most Asked Questions on Servo Motor

Most Asked Questions on Servo Motor (Answers)

Transformers Questions & Answers Part-2

Transformers Questions & Answers Part-2

Protection Relays Interview Questions & Answers

Protection Relays Interview Questions & Answers

Stepper Motors Objective Questions & Answers

Stepper Motors Objective Questions & Answers

Top Electrical Engineering Interview Questions for Freshers

Top Electrical Engineering Interview Questions for Freshers

More Articles

Control system architecture diagrams

Vendor Document for Project Systems Architecture

Loop Splitter Theory of Operation

4-20 mA Loop Splitter

Pneumatic and Hydraulic Projects

200 Pneumatic and Hydraulic Projects List

Top Embedded Systems Projects for Engineers and Students

200 Top Embedded Systems Projects for Engineers and Students

Voltage Regulator Circuit

Basics of Voltage Regulator

Why 4-20 mA Current Signal is used instead of Voltage Signal

Why 4-20 mA Current Signal is used instead of Voltage Signal?

Solar Arrays

Solar Photovoltaic Cells – Parts of the Solar Panel

Zener Diode Voltage Regulator Operation

Zener Diode Voltage Regulator Operation

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?