Differential Pressure Switch Calibration Procedure

Pressure Differential Switch Calibration

Test Equipment Required:

  1. Pneumatic Calibration
  2. Digital Multimeter
  3. Test Gauge

Typical Test Set-up

Differential Pressure Switch Calibration Procedure - Copy

 Calibration Procedure

a. Check and confirm instrument range as per specification.

b. Hook-up instrument as per typical test set-up.

For Switch Low

1) Apply the calibrating pressure above the reset value of the set pressure.

2) Slowly decrease the calibrating pressure and confirm switch contacts transfer from N.C. to N.O. (or vice versa).

3) Record the pressure where the switch contact transfer happened.

4) Increase the calibrating pressure until the switch resets (Multimeter continuity will change) and record the reset point.

For Switch High

1) Gradually increase the calibrating pressure to the set pressure and confirm switch contact transfers from NC to NO (or vice versa).

2) Record the pressure where the switch contact transfer.

3) Decrease the calibrating pressure until the switch resets (Multimeter continuity will change) and record the set point

Record all result in instrument Calibration (Switches) Test Check sheets or Calibration Check Sheet.

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address

1 thought on “Differential Pressure Switch Calibration Procedure”

Leave a Comment